Key features
- Steel portal frame construction
- Unit C: 7 Dock levellers & 1 eurodock leveller Unit D: 8 Dock levellers & 2 eurodock levellers
- 2 Level access doors
- Unit C: Minimum 125 car parking spaces Unit D: Minimum 155 car parking spaces
- Unit C: 12.5m eaves height Unit D: 15m eaves height 15M
- 500 KVA power supply to both units
- Unit C: 55m yard depth Unit D: 50m yard depth
- 50Kn/m floor loading
- BREEAM very good (targeted)
- EPC A rating (targeted)
Property description
To Let 2 New Industrial / Warehouse Units
Phase 2 Coming Soon - Available 2026
Unit C: 98,436 sq ft & Unit D: 120,825 sq ft
Full planning permission granted - D&B opportunities available
The units will benefit from the following specificaiton:
Location
Prime Point, Hollins Grove Street , Darwen, Lancashire
Thank You
Your request has been received. A member of the team will be in touch.